Chargement...

QJ61BT11N
Mitsubishi CC-Link Master/Local module

For more information on how your data is processed and stored please read our privacy policy.

2 year warranty 2 year warranty*

Worldwide delivery Worldwide delivery

Returns accepted Returns accepted

*Manufacturer's warranty does not apply

CC-Link Master/Local module
Description

A propos de ce produit

Voici tout ce que vous devez savoir

 

Mitsubishi QJ61BT11N modules are CC-Link system master/local modules. CC-Link is a system that connects distributed modules such as I/O modules, intelligent function modules and special function modules using dedicated cables so that the modules can be controlled by a PLC CPU. See detailed specifications for the QJ61BT11N CC-Link system master/local modules in the specifications table below.

QJ61BT11N Specifications
Part numberQJ61BT11N
Transmission speedCan select from 156 kbps/625 kbps/2.5 Mbps/5 Mbps/10 Mbps
Max. number of connected
stations 
64
Number of occupied stations
(local stations) 
1 to 4 stations
The number of stations can be switched using the GX developer
parameter setting 
Communication methodBroadcast polling method
Synchronous methodFrame synchronisation method
Encoding methodNRZI method
Transmission pathBUS (RS-485)
Transmission formatConforms to HDLC
Connection cableCC-Link dedicated cable/CC-Link dedicated high-performance cable/
Ver. 1.10 compatible CC-Link dedicated cable 
RAS functionAutomatic return function
Slave station cut off
Error detection by the link special relay/register 
Number of I/O occupied points32 points (I/O assignment: Intelligent 32 points)
5 VDC internal current consumption0.46 A
Weight0.12 kg
PDFs

Les spécifications

Les spécifications ci-dessous sont applicables à ce produit

ManufacturerMitsubishi
Range typeInterface Module
RangeMELSEC System Q
PDFs

Vous recherchez plus d'informations sur ce produit?

Voici quelques fichiers PDF, vous pouvez télécharger

PDF Mitsubishi System Q Brochure

Stopping downtime for over 40 years

En savoir plus sur nous

Northern Industrial We’ve come a long way since our small workshop in the 90s.
Northern Industrial Microsoft did a story on us after we were the first business in the whole of the UK to install Windows 2000 server.
Northern Industrial Back in the early 2000s we had a small group of engineers compared to over 40 today.
Northern Industrial We’re continuously developing our test facilities including the use of robots.
Northern Industrial Our current building is home to thousands of automation parts in Lancashire, England.
Northern Industrial Celebrating our 40th birthday in 2018 with John (centre) who started Northern Industrial back in 1978!