Caricamento in corso...

CX1500-M200
Beckhoff LightBus Master Interface Module

For more information on how your data is processed and stored please read our privacy policy.

2 year warranty 2 year warranty*

Worldwide delivery Worldwide delivery

Returns accepted Returns accepted

*Manufacturer's warranty does not apply

LightBus Master Interface Module
Description

A proposito di questo prodotto

Ecco tutto quello che c'è da sapere


The CX1500-M200 is a lightbus master interface module design and manufactured by Beckhoff. Lightbus offers;

  • 2.5 Mbaud data rate 
  • 25 µs transmission time for 32 bits of user information 
  • Intelligent commands for read, write, address initialisation, configuration and line test; communication is executed automatically. up to 255 I/O modules in one ring with up to 65,280 I/O points (e.g. 64 x 4-channel Bus Terminals x 255) 
  • up to 300 m transmission distance between two I/O modules with HCS fibre, 45 m using plastic fibre optic (PMMA fibre)

 

CX1500-M200 Technical Specifications

 

FieldbusLightbus
Data transfer rates2.5 Mbaud, 32 bits of process data in 25 µs
Bus interface2 x fibre optic
Bus devicemax. 254 nodes with a max. of 65,280 I/O points
Interface to the CPUISA plug and play, 2 kbyte DPRAM
Max. power loss2 W
PropertiesLightbus – process data communication can either be free running or synchronised
Dimensions (W x H x D)38 mm x 100 mm x 91 mm
Weightapprox. 220 g
Operating/storage temperature0…+55 °C/-25…+85 °C
Relative humidity95 %, no condensation
Vibration/shock resistanceconforms to EN 60068-2-6/EN 60068-2-27/29
EMC immunity/emissionconforms to EN 61000-6-2/EN 61000-6-4
Protection classIP 20
PDFs

Le specifiche

Le specifiche di seguito si applicano a questo prodotto

ManufacturerBeckhoff
RangeOther
PDFs

In cerca di maggiori dettagli su questo prodotto?

Qui ci sono alcuni file PDF che è possibile scaricare

Stopping downtime for over 40 years

Ulteriori informazioni su di noi

Northern Industrial We’ve come a long way since our small workshop in the 90s.
Northern Industrial Microsoft did a story on us after we were the first business in the whole of the UK to install Windows 2000 server.
Northern Industrial Back in the early 2000s we had a small group of engineers compared to over 40 today.
Northern Industrial We’re continuously developing our test facilities including the use of robots.
Northern Industrial Our current building is home to thousands of automation parts in Lancashire, England.
Northern Industrial Celebrating our 40th birthday in 2018 with John (centre) who started Northern Industrial back in 1978!