Chargement...

1746-QS
Allen Bradley Synchronized Axes Module

For more information on how your data is processed and stored please read our privacy policy.

2 year warranty 2 year warranty*

Worldwide delivery Worldwide delivery

Returns accepted Returns accepted

*Manufacturer's warranty does not apply

Synchronized Axes Module
Description

A propos de ce produit

Voici tout ce que vous devez savoir


This module offers four axes of closed-loop servo positioning control, using internal logic to synchronize multiple axes. The 1746-QS features a differential interface to either pulse-width modulated (DPM) or start/stop pulse (RPM) linear displacement transducer (LDT) inputs.

Compatible LDTs are:

  • Balluff BTL-2-L2 or -M2
  • Gemco Quick-Stick II
  • Santest GYRP or GYRG
  • Temposonics II with DPM or RPM
1746-QS Specifications
Number of Inputs4
Number of Outputs4
Backplane Current (mA) at 5V 1000 mA
Backplane Current (mA) at 24V     200 mA
Voltage CategoryInput: LDT with RPM or DPM
Output: -10V dc…10V dc
Analog Output-10…10V dc at 5 mA
Output Resolution 12-bit
Module Update Time2 ms
Fail-safe TimersDrive Output Disable: 15 μs
Software Reset: 30 ms
LDT Range and Resolution2.30 in. @ 0.004 in.
120 in. @ 0.002 in.
60 in. @ 0.001 in
Module Cable Connections     I/O to IFM: -DB-26 subminiature (1492-ACABLE)
Configuration/Diagnostics: -DB-9 (1746-CP3)

LDT Cable Length
RPM type: 45.7 m (150 ft)
DPM type: 61.0 (200 ft)

 

 





.



PDFs

Les spécifications

Les spécifications ci-dessous sont applicables à ce produit

ManufacturerAllen Bradley
Range typeMotion Control Module
RangeSLC-500
PDFs

Vous recherchez plus d'informations sur ce produit?

Voici quelques fichiers PDF, vous pouvez télécharger

PDF SLC-500 Selection Guide
PDF Allen Bradley SLC-500 Brochure

Stopping downtime for over 40 years

En savoir plus sur nous

Northern Industrial We’ve come a long way since our small workshop in the 90s.
Northern Industrial Microsoft did a story on us after we were the first business in the whole of the UK to install Windows 2000 server.
Northern Industrial Back in the early 2000s we had a small group of engineers compared to over 40 today.
Northern Industrial We’re continuously developing our test facilities including the use of robots.
Northern Industrial Our current building is home to thousands of automation parts in Lancashire, England.
Northern Industrial Celebrating our 40th birthday in 2018 with John (centre) who started Northern Industrial back in 1978!